A wiring-related fire: what needs to be established

Short circuit, overload, abnormal operation, household appliances and the condition of the electrical installation.

A wiring-related fire hypothesis must be tested for signs of abnormal operation, overload, short circuit, insulation damage, improper installation or equipment use.

A melted conductor does not automatically mean that electrical systems caused the fire.

What you can do

  • gather documents and photographs;
  • formulate technical questions for the expert;
  • check findings in previous materials;
  • prepare a specialist opinion or an expert report review.

Expanded on 21 October 2026

Charred wood fragment and an electrical component on an inspection table
This illustration was created using AI and does not relate to a particular examination.

A damaged wire is not always the cause

An electrical component can change before a fire starts or as a result of its development. Explanation requires considering its location, circuit condition, other traces and incident materials. A photograph of a melted section without provenance does not establish the sequence.

Data useful for testing the hypothesis

  • Electrical installation diagram and connected load information.
  • Maintenance, repair and known-fault records.
  • Scene inspection materials and records of component locations.
  • Information on actions after the fire was discovered and on dismantling.

Do not power up surviving equipment or clean damaged components yourself to “test” them. Whether and how items may be handled and transferred depends on safety and the examination’s purpose.

The opinion must distinguish observed signs, the hypothesis tested and the limits of a causal finding. An electrical line of inquiry does not automatically establish a particular person’s culpability.

On this subject: After a fire: materials to gather before dismantling structures.

Consultation

Send fire-related documents for a preliminary assessment

Describe the circumstances and attach photographs, an official decision or certificate, EMERCOM materials, insurance documents, a court order or another expert’s report. Reviewing them will help define the type of work, timeframe and cost.

  • a court-appointed examination under a court order;
  • pre-trial specialist opinion;
  • a review of another expert’s report;
  • analysis of the fire cause, origin and proposed fire development scenario.

Up to 10 files, 10 MB each. Keep original documents and images; transfer of large materials is agreed separately.

How data is processed: Personal Data Processing Policy. Attach only materials relevant to the fire; redact unnecessary data about other people.

For assessment, preferably attach photographs of the fire scene, EMERCOM, insurance and court documents, contracts and any existing reports.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

Fire investigation: cause, origin, electrical systems, alarms and report reviews
Write to usDiscuss your task ↗